Apartment EV charging approvals: supply, bay rights and billing

Prepare a strata charging proposal that separates electrical capacity, common-property permission, parking rights, billing and equitable future access.

Solar Battery Australia · Published

Illustration of an electric vehicle connected to a charging unit
Original editorial illustration. Not an installation photograph or a technical wiring drawing.

A parking space is not the whole permission question

Owning or using a bay does not automatically authorise cabling through common property or use of a shared supply. A proposal must address the bay rights, cable route, electrical source and building rules together. Start an apartment EV charging assessment before purchasing a charger.

The NSW Government resource cited below separates feasibility, approvals, installation and ongoing operation. Other states and territories have different strata laws. Ask the strata manager and an appropriate legal adviser which resolution, by-law or consent is required for the specific building and scope; this article does not prescribe a voting threshold.

Choose a building approach before a charger brand

Approaches to put to the owners corporation
ApproachQuestion to settle
Individual connectionCan the proposed meter and route serve the bay lawfully and safely?
Shared charging baysHow are booking, access, parking turnover and payment managed?
Scalable building infrastructureWhat common capacity and pathways support later residents?

Capacity needs a building assessment

Unused-looking switchboard space is not evidence of spare electrical capacity. Ask for an assessment of existing demand, supply constraints, routes and load management. The proposal should show how charging affects common services and how future demand is handled. A single early installation should not consume unallocated capacity without the building understanding the consequences.

Make the cost-recovery model explicit

Separate common enabling works from each owner’s charger and electricity use. Decide who owns the infrastructure, pays maintenance and replaces failed equipment. Metered charging can involve software, communications, administration and transaction fees as well as energy. Ask how the rate is set and changed, and how residents can query a bill.

  • Allocation of shared installation costs between initial and later participants.
  • Energy and service fees, including how they are measured and reviewed.
  • Responsibilities when a lot is sold or a resident moves.
  • Access for maintenance, faults and emergency response.
  • Data access and consequences if a billing-platform provider changes.

An equitable model should explain how a later resident joins and whether earlier owners recover any enabling costs. It should also cover residents who do not have EVs. These are governance decisions, not assumptions the electrician should be left to invent after installation.

Keep solar and charging decisions distinct

The existing strata solar article addresses shared roof generation. Charging adds bay access, vehicle schedules and cost-recovery issues even where no solar exists. If the proposal uses surplus solar, read the surplus-charging guide and confirm which meter actually sees that generation.

For a larger shared installation, the fleet planning worksheet offers useful energy and coincident-demand concepts, but a residential building is not a depot: parking rights and resident governance remain separate.

Bring a decision-ready pack to the meeting

Include the energy assessment, route drawing, proposed ownership and billing model, scope and exclusions, maintenance responsibilities and approval advice. Record unresolved questions instead of promising an installation date. The project planning guide helps order the dependencies. The higher-level EV charging service provides the wider technical enquiry route without replacing owners corporation approval.

Sources and scope

Source check: 5 October 2026. General educational information, not an electrical design or a site assessment. Product instructions, local rules and contract terms must be checked for your circumstances.