Solar, battery and EV project-planning worksheet

A printable dependency table for survey, supply assessment, design, approvals, installation and handover, with responsibilities and variable steps made explicit.

Solar Battery Australia · Worksheet issued

You can also use your browser’s Print menu. Checklist ticks are temporary and are not saved.

Illustration of rooftop solar beside a planning document
Original editorial illustration. Not an installation photograph or a technical wiring drawing.

Use dependencies, not a promised number of days

Solar, storage and charging projects often share supply capacity, board space, metering and control requirements. Treating them as unrelated purchases can leave gaps between scopes. This worksheet helps record what must be confirmed, who owns it and what evidence closes the step. The order can overlap or change with the site.

Use the site-assessment checklist first. Then discuss the combined scope through solar and battery planning and EV charging. This page is not a statement of Solar Battery Australia’s delivery process, availability or timelines.

Dependency and responsibility table

Print and add a named owner and agreed date beside each stage
StageBefore moving onPossible responsible partiesRecord / owner / date
Goals and dataAgree current loads, future loads and backup prioritiesOwner, operator or building manager________________
Survey and supplyConfirm roof, access, equipment locations and electrical constraintsDesigner, electrician, roof/structural adviser as needed________________
Design and scopeResolve retained equipment, controls, circuits and exclusionsSystem designer and relevant installers________________
PermissionsConfirm network, property and planning requirementsNetwork, owner/strata, authority and applicant________________
Metering coordinationAgree retailer/provider prerequisites and accessRetailer, metering provider, electrician________________
Installation schedulingRequired approvals, equipment and access are readyContracted installers and site owner________________
Commissioning / handoverRecord tests, configuration, instructions and outstanding itemsInstallers and owner________________
Follow-up billing/dataCheck complete operating and billing periodsOwner, retailer and support provider________________

Assign ownership instead of assuming one party does everything

The installer may submit some applications, while a retailer arranges metering and an owners corporation grants common-property permission. Ask for those responsibilities in writing. The smart-meter process guide separates the parties. If a stage depends on someone outside the installation contract, record that dependency explicitly.

Resolve shared infrastructure early

A switchboard assessment should consider the combined loads and proposed equipment. Where supply constraints arise, discuss three-phase upgrade assessment rather than assuming an upgrade is required or sufficient. Smart-meter coordination is another workstream, not proof that the supply or board is suitable.

Keep design changes visible

Change record
ChangeEffect on scope / approvalsOwner and decision
Equipment substitution________________________________________________
Additional load or backup circuit________________________________________________
Site condition or access change________________________________________________
Approval or metering requirement________________________________________________

A different inverter or battery can change compatibility and backup behaviour. Read the battery retrofit guide before treating substitutions as equivalent. In a new build, pre-construction solar provisions help coordinate work before walls and roof layouts are fixed.

Define completion in records as well as hardware

Use the handover checklist to collect documentation, monitoring ownership and written operating instructions. Note unresolved items, their responsible party and an agreed next action. The worksheet is printable and unsaved; keep your completed copy with the project records rather than entering private details into this website.

Sources and scope

Source check: 5 October 2026. General educational information, not an electrical design or a site assessment. Product instructions, local rules and contract terms must be checked for your circumstances.