Use this worksheet before the visit
Gather what you already know; leave technical unknowns for the assessor. Print this page and write on the tables, or use the checklist boxes while reading. Entries are not saved or sent anywhere. This is a household preparation aid, not an inspection record or a certificate of suitability.
For a generation project, start with solar systems. For storage added to existing solar, use battery installation. A combined solar and battery assessment should consider the interaction between equipment, while switchboard assessment addresses the electrical infrastructure. No particular upgrade is assumed necessary.
1. Bills and usage
| Prompt | Your notes |
|---|---|
| Usual daytime occupancy and large daytime loads | ________________________________________________ |
| Evening / overnight loads | ________________________________________________ |
| Data period and missing information | ________________________________________________ |
| Planned EV, heating, cooling or business loads | ________________________________________________ |
The monitoring data explainer helps distinguish inverter production from retailer imports and exports. Do not send account passwords with your enquiry. Provide only the records needed through the agreed contact process, and remove unrelated personal information where appropriate.
2. Existing equipment and safe access
Do not climb onto the roof, remove equipment covers or open the switchboard to gather information. Ground-level observations and existing records are enough for preparation. The assessor decides what inspection, testing or specialist roof advice is required. A visual impression of spare board space is not a capacity assessment.
3. Goals and priorities
| Goal | Priority / notes |
|---|---|
| Daytime solar use | ________________________________________________ |
| Evening stored energy | ________________________________________________ |
| Essential outage loads and desired duration | ________________________________________________ |
| Future vehicle or building changes | ________________________________________________ |
| Budget constraints to discuss privately | ________________________________________________ |
Describe backup in everyday terms
List the appliances you hope to use and how long, but ask the designer to verify running and starting loads. Read battery capacity versus power before choosing a kWh target. Backup capability depends on the complete system, circuits and phase arrangement, not just the presence of a battery.
4. Questions for the assessor
If construction has not started, use new-home solar provisions for builder coordination. After the assessment, transfer unresolved dependencies to the project planning worksheet. This checklist prepares information about the property; it does not duplicate the existing installer-selection article or certify any provider’s qualifications.
Sources and scope
Source check: 5 October 2026. General educational information, not an electrical design or a site assessment. Product instructions, local rules and contract terms must be checked for your circumstances.
- Australian Government — Design considerations
Roof direction, slope, shade, condition, future loads, network limits and expansion constraints.
Scope: Australia; local network and planning rules vary. Source date: No publication date displayed.
- Australian Government — Monitor your solar system
Generation versus usage monitoring; extra measurement devices; app connectivity; battery operating configuration.
Scope: Australia. Source date: No publication date displayed.
- Australian Government — Batteries
Usable capacity versus power; AC/DC coupling; backup requires configuration; site restrictions; warranty and management questions.
Scope: Australia. Source date: Includes program information commencing 1 July 2025; page date not displayed.
- Australian Government — Look after your solar system
Weather and seasonal variation; soiling and shade; qualified cleaning and repairs; solar can remain energised with mains off.
Scope: Australia. Source date: No publication date displayed.
Discuss your project or system
Share your goals and the information you have collected. Ask what assessment is appropriate for your circumstances.

